double stage recycling machine installation and use attention

Date: 19th Jul, 2017

First part
1, before double stage recycling machine starting, the first heating about four or five minutes. The temperature rose to pull the motor by the motor belt to ease; according to the normal working rotation of continuous pull eight to ten times. And then continue to heat up for about ten minutes, and then boot, but to continue to heat, because the normal production needs to continue to add heat; according to different nature of the plastic to adjust the different temperature. The following are the same as the ”
2, double stage recycling machine normal work, the machine temperature to maintain stability, do not fluctuate. Near the vent hole, until the nose part of the temperature to keep about 200 ℃ (referring to the material, ethanol). The following are the same as the ”
3, into the material to be uniform, and add enough. Machine feed speed and feed speed to be appropriate. Otherwise it will affect the quality and yield of particles. The following are the same as the ”
4, shutdown, the host to completely cut off the power. The head of the wire plug (with the wrench part) must be taken off. Until the next time before use alone warm up.

Second part
1, double stage recycling machine to run forward; to avoid reverse. The following are the same as the ”
2, double stage recycling machine should not cool the operation of the cooling machine, must heat machine feeding operation, so to avoid the occurrence of stick stick (bearing axis) phenomenon. The following are the same as the ”
3, double stage recycling machine inlet, vent hole is strictly prohibited into the iron and other debris. So as to avoid accidents and affect production. The following are the same as the ”
Third, double stage recycling machine work in the process of attention
1, at any time pay attention to changes in body temperature, with a clean hand touch sliver does not stick, it should immediately heat up. Until the sliver is normal. The following are the same as the ”
2, reducer bearing parts burned, or accompanied by noise should be timely maintenance, and add fuel. The following are the same as the ”
3, the host bearing at both ends of the bearing parts of the hot hand or murmur, to stop maintenance and add butter. Normal work, the bearing room every 5-6 days plus butter once. The following are the same as the ”
4, pay attention to find out the operation of the machine; such as: temperature, speed, speed, according to the situation, timely processing. The following are the same as the ”
5, the fuselage is unstable, should pay attention to check the coupling of the gap is too tight, to timely loose some loose.

This site is protected by WP-CopyRightPro